While I've Been Away

Previous family vacations haven't led to scheduled work progressing as planned. I do recall a family trip to Costa Rica where as soon as I left it appeared all work just completely ceased.  

This time I had arranged a significant amount of sensitive work to take place - in all four crews were organized and very significant amount of work was booked (basement framing, plumbing, electrical start and full hvac rough in).  

These are among my most reliable contractors so by Thursday of the week I was fairly curious to find out what was happening. As I found out a bunch of little things were going wrong but most of the big stuff was working out.  I'll catch up with the project Monday morning and work out a way to resolve any unhappy surprises.   

 

IMG_3915.JPG

What is wrong with this picture? The wiring and plumbing for the laundry is going in backwards.  Fortunately the sheet metal installer sent me a text and we were able to start fixing it before we layered on more errors.  My inner control freak is having a hard time being so detached from the project.