Tough year for pace of work

It is always a relief for the builder to get out of the ground, that means concrete walls, inspections, subfloor install and finally dirt backfill. This puts us right at the stage where everyone else is, paused and needing framing labour. Perhaps the highest demand trade right now, the framers are super busy. This makes it really tough to get to the portion of the build where control of the schedule is more within the power of the builder. So we will play the start/stop game for a while, until we can get to lockup.