After truss assembly it was clear we had a problem. The roof peak was offset somehow to the centre of window. It didn’t look terrible but was one of those items that once you’ve seen it, you can’t unsee it. Rather than bungling around attempting to fix it on site I called the supplier. They agreed to replace the affected area and rushed it out in a couple days. The framers pulled off the offending area and reinstalled the repaired new truss pack. Overall a small but significant problem overcome with a lot of cooperation. The rain caused more delay than the wait for the new trusses.
It all came down as one assembly thanks to the power of the machine
And the new trusses are installed and we are back in action with the shingles loaded and roofers hard at work all day