The finishers installed the last of the closet built in material and the flooring guys sanded all the seams in the plywood subfloor. With the sanding and dust removed plus the closets prepped the painter is in a good position to start the spraying of the doors and trim.
Subfloor is sanded and buckets of sawdust removed.