With final installation of finishing material underway at the rowhouse project we are continuing to overcome obstacles to completion. The basement slab insulation was not nicely detailed with the top of foundation wall. This led to some awkward interface issues and uneven concrete to cover with flooring.
Nasty area to cover with flooring.
Self levelling compound applied
And flooring can be completed