Despite the hideous winter conditions that seem to maybe be finally relaxing a little, we need to proceed with the garage. This means thawing out the ground frost so we can pour the slab. We’ve got a new crew with a hydronic heating truck. Essentially hot liquid is pumped in pipes laid on the ground under a tarp. Eventually the ground thaws and we can pour the slab. It costs a little extra money but what is even more costly is delaying the entire project until spring weather thaws the ground. We want to do our stucco once rather than make two trips out of it and we need to get landscaping right away (in may).
we used a skid steer to remove the snow and the heat unit is placed right beside the garage. Once thawed we can start the concrete prep work.