Rowhouse infloor heating

The final pre pour work was completed today with the install of the network of pipe for in slab heating.  Once inspected this will give us the go ahead to pour the concrete and we can start developing the basement living space.   

 

IMAGE.JPG

Lots of heat pipe is fastened using the low tech method of cable ties to the rebar.