With walls primed, the door and trim package dropped off and the crew hanging doors, we’ve officially started the finishing stage. This is a nice phase to be in with a mild start to early winter a lot of outside work was done. Once the cold temperatures really hit we will be solely focusing on interior work, warm, dry and well lit.
We will feature a black hardware package in this project rather than the usual satin chrome. Looks good so far.