Garage slab prep

the prep crew arrived to prepare the garage slab.  This was a multi step process, first we scraped the fill to the proper height. Next we augered middle support holes.  Gravel was distributed and compacted.  Styrofoam and rebar applied.  Finally, as a cost saving measure we installed the network of pex pipes to allow later install of slab heating. 

 

IMAGE.JPG

Ready to pour