the prep crew arrived to prepare the garage slab. This was a multi step process, first we scraped the fill to the proper height. Next we augered middle support holes. Gravel was distributed and compacted. Styrofoam and rebar applied. Finally, as a cost saving measure we installed the network of pex pipes to allow later install of slab heating.
Ready to pour