The decision was made to proceed with the sewer install during the winter season. Unfortunately the deep frost and overall difficult conditions add a lot of cost to the already expensive install. With heavy machinery arriving on site we’ve removed two very full dumpster bins and cleaned the front yard so the crew can work tomorrow.
The huge bucket is useful for scraping the street.
Another load of drywall scrap is removed from the front and placed in the new bin. Sewer install prep is complete.