Summer slow down

We haven't got been issued building permits to start work on the next two projects, so it looks like a summer slowdown is in order.  Why I can't have this permit lag in January rather than July has been very frustrating.  Warm construction weather in calgary is a precious commodity that I am currently squandering while dealing with the paperwork issues.  The threeplex has been particularly difficult and slow to progress.  The plan remains to get the concrete work for both projects done with plenty of warm weather to spare.

 

IMG_4771.JPG

a flock of pelicans relaxing on a gravel bar, late summer evening, Bow River SE Calgary near Cranston.