Appliance delivery is another nice progress milestone in the project. It also means a large load of recyclables to the depot. We need the plumber to finish installing all of these appliances, because I don't like to make water connections myself. For example, he must run the fridge water line and connect it to the fridge, add the dishwasher drain line and supply, and do the gas connection to the oven. All of this work is definitely in the realm of needing to know how to do it, which disqualifies this builder, particularly for the gas job. I get to put in the microwave and trim kit (didn't fit, needs kitchen guy back), and the range hood (can't finish until the mechanical final), so basically I can't do anything except recycle (and pay bills, my two main roles in this project).