We snuck in the firewall pour and it was a timely bit of progress, as the weather is truly hideous for the foreseeable future. The framers were back at it today to try and salvage a little progress this week, and installed much of the second floor structure on the third unit.
The cribbers returned and stripped the forms, stacking them for re-use later on once we are ready for the final pour. With Christmas break upon us, I think this will be my last progress update until we get through the inspections at the semi-d, or somehow the framers work through the cold after boxing day. I will also be composing a year in review type post, and that will be it for 2017. Merry Xmas everyone!