Our framers are back and healthy, and the weather has improved by about 15 degrees C so we are seeing some progress on subfloor two. The second floor structure is trickier to put on than the main, it features some cantilevers, a stairwell opening in the middle of the building and various notched joists and hanger details.
With continued good weather forecast we may see them try and make up a lost day by working the weekend. That will be a great way to make up for some lost weeks over the holidays. Here is a photo from the progress today, we will be seeing the floor sheeted and with any luck the stairs hung.