Garage building

The mild fall conditions have been very nice for the builders so far as we get near the end of September. The crew I usually use to do concrete work gets very busy with a late season push to pour flatwork before the ground gets cold. Immediately after gas line install we had them lined up to do all the sidewalks, patios and garages. A noisy and messy affair but we can try and get the garage built next week.

Pads and patios done. Next up is the garage framing with lumber and trusses booked for next week. Once the garage is framed we can hook up the electrical system to permanent meters from the temporary pole. That will energize the plugs and lights inside the house. For trade convenience