Another round of touchups
I met with the siding installer and we tackled a bunch of exterior touchups including painting over some colour matched caulking that didn’t match very well. We filled a few nail holes and added some fasteners in a few spots that seemed to have buckled a little, typical Calgary response to heating, cooling and humidity. Then of course effort was made to fix up areas where the stucco was spread on the siding and silicon caulked a few flashings. At this point you have to say enough because you can continue to do touchups forever. Once the exterior handrails go on we can get the photographer to return to do the exterior shots and list the second half of the building. Expect to see this complete by the end of the week and new photos will be published.