Integer Homes

View Original

stucco scratch coat stage

With the mild and stable weather we’ve enjoyed (vs last year), the stucco crew, a very large bunch, was able to get the scratch coat on in 2 big days.   It is amazing the production a crew like this is capable of and how difficult and laborious the work is.  We are definitely lucky in Calgary that people want to come here and work as most of our homegrown ‘talent’, myself included, wouldn’t be able to do this work.   

 

Huge walls consume a massive pile of sand and two pallets of mix.