Roof Installation Underway
The framers have installed about half the trusses by the end of the workday today. With the crane booked again for tomorrow afternoon they should be able to have the rest of the trusses on by the weekend.
Note the middle truss is doubled and both sides are covered in a layer of 5/8 drywall. This is a continuation of the fire protection to reduce the likelihood of fire spread between the houses.